Wednesday, December 31, 2008

Building up enough nerve

I am trying to build up enough nerve to go and ask my manager whether I can take over the project. Exclude the vendor. Call them when we need them.

If I do this. All blame is on me. All pressure is on me.

But I am in control.

And I never let me down.

No comments:

Post a Comment